Technical Assignments
Technical Assignment One | ||
This Technical Assignment takes an in depth look at the existing conditions for the project 2175 K Street NW, Washington D.C. Numerous key aspects of construction management were explored; including the project schedule, the building systems, the project cost, the existing conditions and existing utilities, the local conditions, the client, the project delivery method, and the staffing plan. | ||
Click Here | ||
Technical Assignment Two | ||
This Technical Assignment focuses on a few key features of the project 2175 K Street NW Washington DC. The areas of emphasis include the project schedule, site layout planning and workflow, a detailed structural estimate, and a general conditions estimate. Additionally, the outcomes of the 2009 PACE Roundtable and present critical industry issues are discussed. To aid in the navigation through this document, bookmarks were established within the report. |
||
Click Here | ||
Technical Assignment Three | ||
This Technical Assignment focuses on investigating areas of 2175 K Street NW Washington DC that are good candidates for further research, alternate methods of construction, value engineering, and schedule acceleration. The topics discussed within will be be the foundation for the final thesis proposal. To aid in the navigation through this document, bookmarks were established within the report. |
||
Click Here | ||